Overview

This roadmap outlines the development path from project inception (January 2026) to the production release of AnvayaOS 1.0 (December 2030). The plan spans five years with annual milestones and quarterly deliverables.

Status Note

  • Current release line: Anvaya 1.8.3 ("Interrupt-delivery repair"). It fixes the intermittent qemu-virt boot hang present since before 1.8.2 and requires the complete five-group local capture at its tag; see the 1.8.3 acceptance contract.
  • Anvaya 1.8.2 ("SHAKTI boot readiness"). It adds the shakti-cclass kernel target, proven on QEMU shakti_c under OpenSBI and under Anvaya's own M-mode resident monitor, and a loading kit for a SHAKTI C-class board. SHAKTI is Buildable; physical boot stays with the 1.9 physical gate. See V1_8_2_GOAL.md, SHAKTI_HARDWARE_READINESS.md and STATUS.md. 1.8.1 was the release validation and firmware maintenance patch to 1.8.0 ("Intelligence and verification maturation"); see the 1.8.1 closure.
  • Anvaya 1.7.2 ("Audit repairs and native intelligence"). The F01–F19 repair retains the complete 135-harness capability-refinement inventory and native intelligence recovery. Its acceptance uses five source-bound local gate records; see the F01–F19 closure record. This remains a QEMU-proven research release without a physical-hardware or external-audit claim. The prior stable v1.7.1 was released 2026-09-05.
  • Anvaya 1.7.0 ("Capability Sockets"), 2026-08-27 — a socket is a capability with kind, resource identity, rights, and generation, and the TCP/UDP/IP/ARP/ICMP/DNS stack runs in a hybrid-signed U-mode task with its own pid, CSpace, and address space. Extraction #5 leaves zero network-service names in product core (core 20,757 → 20,740; privileged TCB 22,379 → 22,362), frames the task composes transit a real device interrupt-driven, and mesh object sync crosses those sockets. Manifesto M8 advances DEBT → PARTIAL — socket payloads still reach their reader through the service's own receive queue rather than the wire, and TCP/UDP over the wire, DNS over the wire, ICMP echo, congestion control, IPv6, and TLS remain planned areas of accepted RFC 0032.
  • An earlier release, Anvaya 1.6.0 ("Content-Addressed Storage"), 2026-08-21, made durable content a userspace service and advanced M6 from DEBT to PARTIAL. The 1.x line since 1.0.0 (1.1 north-star realignment, 1.2 scheduling/IPC to spec, 1.3 proof-body dissolution and honest core/harness accounting, 1.4 the real launcher and verify-only kernel, 1.5 driver domains, 1.6 content-addressed storage, 1.7 capability sockets) continues the QEMU-proven scope below; see STATUS.md and CHANGELOG.md for the authoritative per-release detail.
  • As of 2026-07-16, Anvaya 1.0.0 ("QEMU-Proven Milestone") is released — the terminal, feature-complete milestone of the 0.x line (not a production-deployed release). All five 1.0 gates (A-E) are closed to their QEMU/software scope (Gates B and D PARTIAL — external audit and physical A/B open): formally verified accepted Nucleus invariants (bounded-exhaustive proofs plus Kani harnesses, unsafe-Rust TCB 0.44%), a reviewed threat model and design-time negative-test regression suite (external audit pending), post-quantum crypto demonstrated across every trust surface with no demonstrated classical-only path (ML-KEM/ML-DSA/SLH-DSA KAT-verified against the NIST ACVP vectors; operational package sig still Ed25519), a published emulated benchmark suite, and a fully evidenced acceptance matrix. This builds on 0.5 (native AI agents), 0.6 (constitution & human override), 0.7 (post-quantum & hardware-anchored), 0.8 (device mesh), and 0.9 (usable & sustainable). Everything is proven under QEMU — no physical hardware exists yet. A physical-hardware boot, an external third-party security audit, and a hardware root of trust remain documented open items; the FML13V01 port stays Buildable, not physically boot-verified. Every milestone has an auditable goal document in the anvaya repo (V0_5_GOAL.md, V0_5_5_GOAL.md, … V1_0_GOAL.md).
  • This roadmap is a planning document, not an implementation ledger.
  • The current repository contains published docs, RFC-backed design contracts, an executable RISC-V/QEMU nucleus proof, bounded SDK/service/runtime/driver crates, a signed WASM proof-app catalog, and reproducible v0.3 proof scripts.
  • Milestones are not considered complete until they have matching code, tests, and demonstrable evidence.
  • The RFC repo now carries a mixed accepted/draft vision/spec blueprint suite. Accepted RFCs define the current design contract; draft RFCs remain direction-setting inputs, not implementation parity.
2026          2027          2028          2029          2030
  │             │             │             │             │
  ▼             ▼             ▼             ▼             ▼
┌─────┐      ┌─────┐      ┌─────┐      ┌─────┐      ┌─────┐
│ 0.1 │      │ 0.3 │      │ 0.5 │      │ 0.8 │      │ 1.0 │
│     │      │     │      │     │      │     │      │     │
│Found│      │User │      │ AI  │      │Dist │      │Prod │
│ation│      │Space│      │Native│     │ribut│      │uction│
└─────┘      └─────┘      └─────┘      └─────┘      └─────┘
Nucleus      WASM         Agents       Mesh         Release
Boots        Apps         Run          Works        Ready

2026: Foundation Year

Theme: Build the core kernel and prove it can work

Q1 2026 (Jan-Mar): Project Setup

DeliverableDescriptionStatus
Project infrastructureGitHub org, CI/CD, documentation🔄 In Progress
MANIFESTO.mdVision document✅ Complete
ARCHITECTURE.mdTarget-state technical specification✅ Published, RFC-backed status still maturing
GOVERNANCE.mdProject governance🔄 Proposed bootstrap framework
Core team recruitment3-5 kernel developers⏳ Planned
Legal foundationEstablish ANVAYA Foundation⏳ Planned

Key Outcome: Project is publicly launched and accepting contributions.

Q2 2026 (Apr-Jun): Nucleus Prototype

DeliverableDescriptionStatus
Boot sequenceNucleus boots on QEMU RISC-V✅ Complete
Capability tablesBounded internal table proof plus v0.2 task-owned CSpace proof; RFC 0007 accepts the software CSpace/handle representation and RFC 0010 accepts opaque syscall handle arguments✅ Accepted representation + prototype evidence
Basic IPCSynchronous message passing🔄 Prototype slice with receiver-authorized bounded CSpace import/export, source-side imported-derivative revocation through cap.revoke, and handle-backed transfer-slot evidence
Memory primitivesPage allocation, virtual memory🔄 v0.2 staged frame/address-space proof with owned page-table frames, inactive Sv39 satp context encoding, physical page-table entry materialization, one-shot satp activation/restore, U-mode page-fault capture, mapped process-owned satp ecall dispatch/restore, reusable process-bound memory frame allocation/map/unmap/revoke dispatch, process-bound cap.identify copy-out, ipc.send copy-in with handle-backed transfer-slot validation, ipc.receive copy-out, ipc.reply copy-in, ipc.call copy-in/copy-out, bounded ipc.cancel endpoint clearing, scheduler-bound ipc.cancel clearing/idempotence, scheduler-bound revoked-endpoint failure/audit evidence: eight events with two failure records, revoked-endpoint denial, IPC denial, and bounded CSpace IPC import/export through translated user windows, syscall facade copy-in/copy-out through translated user windows, page-walk evidence, and user-copy window validation; production scheduler-grade satp switching still planned
Nucleus syscall ABIVersion/startup, capability, IPC, memory, trap, interrupt, wait/cancel calls✅ Accepted RFC 0010; proof facade plus trap-frame register adapter implemented for ABI version, capability, IPC send/receive/call/reply/cancel, and memory calls, with cap/IPC buffers routed through translated user windows, handle-backed IPC transfer slots, bounded CSpace import/export with source-side imported-derivative revocation through cap.revoke, and IPC audit hooks; one-shot, mapped, register-seeded, and manifest-backed process-owned U-mode ecall proof implemented for ABI/bad-syscall plus one scheduler/launch-table-bound manifest init entry/return proof, one scheduler/launch-table-bound multi-syscall loop for cap.identify, ipc.send, ipc.receive, ipc.reply, ipc.call, ipc.cancel, mem.frame_alloc, mem.map, mem.unmap, and cap.revoke with checked launch-table resume plus IPC send/receive/reply/call/cancel windows, endpoint queue, transferred timer-capability, returned endpoint-capability and device-frame capability fields, audit evidence: eight events with two failure records, scheduler-bound bad-length call failure/audit validation, scheduler-bound cancel clearing/empty-idempotence validation, and scheduler-bound revoked-endpoint failure/audit validation, reusable process-bound memory mem.frame_alloc/mem.map/mem.unmap/cap.revoke, process-bound cap.identify, ipc.send, ipc.receive, ipc.reply, ipc.call, bounded ipc.cancel, bounded process-bound wait_one/cancel_token timeout/cancel/completion, bounded scheduler wait-token queues for timeout/cancel/complete unblocking, and revoked-endpoint denial with IPC failure probes; production service-grade wait-token integration and full reusable scheduler/loader-bound dispatcher planned
Serial consoleDebug output and input✅ Complete

Key Outcome: First-light Nucleus runs on the emulator, consumes boot metadata, proves request/reply handoffs, exercises a bounded object/task capability table, proves a staged capability-backed memory-isolation slice with owned page-table frames, inactive Sv39 satp context encoding, materialized page-table entries, one-shot satp activation/restore, U-mode page-fault capture, mapped process-owned satp ecall dispatch/restore, reusable process-bound memory frame allocation/map/unmap/revoke dispatch, process-bound cap.identify copy-out, one scheduler/launch-table-bound cap.identify/ipc.send/ipc.receive/ipc.reply/ipc.call/ipc.cancel/mem.frame_alloc/mem.map/mem.unmap/cap.revoke multi-syscall loop with checked launch-table resume, IPC delivery/reply/call/cancel/audit validation, scheduler-bound bad-length call failure validation, scheduler-bound cancel clearing/empty-idempotence validation, scheduler-bound revoked-endpoint failure/audit evidence: eight events with two failure records, process-bound wait_one/cancel_token timeout/cancel/completion, bounded scheduler wait-token timeout/cancel/complete unblocking, ipc.send copy-in with handle-backed transfer-slot validation, ipc.receive copy-out, ipc.reply copy-in, ipc.call copy-in/copy-out, bounded ipc.cancel endpoint clearing, revoked-endpoint denial, bounded CSpace IPC import/export with source-side imported-derivative revocation through cap.revoke, and IPC audit hooks through translated user windows, syscall facade copy-in/copy-out through translated user windows, page walks, and Sv39-shaped PTE records, and now has an accepted RFC 0010 syscall ABI target plus a proof-backed facade, trap-frame register adapter, one-shot/mapped/register-seeded/manifest-backed process-owned U-mode ecall proof, one scheduler/launch-table-bound manifest init entry/return proof, and minimal process/loader wrapper before the full reusable scheduler/loader-bound dispatcher and production process loader are implemented.

Q3 2026 (Jul-Sep): First Hardware

DeliverableDescriptionStatus
Hardware portBoot on DC-ROMA/Framework Mainboard I (FML13V01, JH7110) under the 0.5.5 evidence gates🔄 Buildable Image/DTB/U-Boot bundle landed; acquired-board proof open
Timer/interruptDTB-validated 4 MHz timer, interrupt topology, and SBI reset on FML13V01🔄 DTB topology and SBI extension probes landed; physical timer/reset proof open
Basic schedulerPriority dispatch, preemption, task states, wait-token unblock outcomes, and aging🔄 Bounded scheduler proof slice
Hardware abstractionExplicit QEMU and FML13V01 resource profiles, then a clean HAL for portability🔄 Strict profile/handoff boundary and virtual hardware-acceptance harnesses landed through v0.5.4

Key Outcome: Nucleus runs on physical RISC-V hardware and begins moving the bounded scheduler semantics into real task dispatch.

Q4 2026 (Oct-Dec): Nucleus Completion

DeliverableDescriptionStatus
Full schedulerPriority tiers, real-time support⏳ Planned
Memory managerComplete virtual memory system⏳ Planned
Capability delegationGrant, delegate, revoke capabilities🔄 Prototype slice
Verification startBegin Verus proofs for core components⏳ Planned
Test suiteComprehensive Nucleus tests⏳ Planned

🏁 Milestone: Anvaya 0.1 — "Nucleus Boots on RISC-V"

Target Date: December 31, 2026

Success Criteria:

  • Nucleus boots on QEMU and real hardware
  • Capability system functional (create, grant, revoke)
  • IPC working (sync message passing)
  • Scheduler operational (priority-based; bounded semantic proof exists, production integration remains)
  • Memory management complete
  • Test coverage >80% for Nucleus
  • Initial Verus proofs for capability semantics

Demo: Boot Nucleus on QEMU virt, emit deterministic serial output, then prove timer-backed request/reply, task-context handoff, endpoint delegation, bounded scheduler semantics, and bounded object/task capability-table behavior before deeper kernel contracts are frozen.


2027: Userspace Year

Theme: Build the services that make an OS usable

Q1 2027 (Jan-Mar): Init System

DeliverableDescriptionStatus
Init processFirst userspace process, service spawning on top of RFC 0010 startup handoff🔄 Bounded byte-backed process-manifest ABI/handoff and init/service-manager proof slices; first live userspace init planned
Service managerStart, stop, restart services🔄 Bounded start/stop/restart/registry proof; live service spawning planned
Async runtimeUserspace async/await support⏳ Planned
IPC client libraryEasy-to-use IPC for services targeting RFC 0010 ipc.* calls🔄 Initial no-std ABI crate in sdk/anvaya-sdk wraps capability, IPC, memory, and wait/cancel calls with a mockable backend

The bounded proof slice already exercises service declaration, capability-gated registration, start, invalid-start denial, failure reporting, restart, stop, registry lookup, table-full denial, stopped-slot reclaim, and restart-limit checks, and now adds a versioned byte-backed init/service manifest ABI, capability handoff, scheduler admission, init-first dispatch, manifest-backed stack mapping, scheduler/launch-table-bound ABI ecall/return state, and service registry publication from a service manifest. Q1 2027 still needs production arbitrary stack allocation, the production userspace init process, and the real service supervisor.

Q2 2027 (Apr-Jun): Core Services

DeliverableDescriptionStatus
Filesystem serviceContent-addressed storage v1🔄 Initial no-std bounded storage core in services/anvaya-storage; nucleus QEMU now exercises storage put/get/list/namespace and denied-rights paths; live userspace service and block persistence planned
Device managerDevice discovery and driver loading🔄 Initial no-std virtio-MMIO recognition core plus QEMU live MMIO, feature negotiation, queue-register programming, bounded queue-layout proof, and one live virtio-blk read transaction exists; live userspace manager planned
Block driversvirtio-blk, NVMe support🔄 Initial virtio block device-id, MMIO, queue-register programming, bounded queue/DMA authority checks, and live sector-0 read in drivers/anvaya-virtio; block writes, persistence, interrupts, and service integration planned
Basic shellCommand-line interface⏳ Planned

Q3 2027 (Jul-Sep): Network Stack

DeliverableDescriptionStatus
Network serviceTCP/IP stack in userspace🔄 Initial no-std DNS/socket authority core in services/anvaya-net; nucleus QEMU now exercises DNS resolve and socket send/receive proof paths; live TCP/IP planned
Network driversvirtio-net, common NICs🔄 Initial virtio network device-id, MMIO, and bounded queue/DMA authority checks in drivers/anvaya-virtio; live queue programming/RX/TX planned
Socket APICapability-based socket interface🔄 Initial bounded socket handles and connect/read/write rights checks in services/anvaya-net; live sockets planned
DNS clientName resolution🔄 Initial DNS-name validation and fixed cache in services/anvaya-net; live DNS packets planned

Q4 2027 (Oct-Dec): WASM Runtime

DeliverableDescriptionStatus
Wasmtime integrationWASM runtime in ANVAYA🔄 Initial no-std bounded WASM parser/interpreter core in runtime/anvaya-wasm with bounded WASI/Anvaya import declarations and explicit deny-by-default imported i32 host calls; nucleus QEMU now exercises all twelve proof-app packages, byte-for-byte source recipe rebuilds, bounded installer-backed launches, and missing-grant denial paths through the bounded runner; richer WASI mediation or equivalent production runtime integration planned
WASI implementationStandard WASI support🔄 Initial no-std file/DNS/socket/clock mediation core in runtime/anvaya-wasi with bounded guest-memory range checks and buffer decoding; nucleus QEMU now exercises imported file/storage/DNS/TCP/clock/extension proof calls through explicit grants; full WASI preview ABI, service IPC, and production import integration planned
ANVAYA WASI extensionsCapability, intent, energy APIs🔄 Initial capability-extension grant checks in runtime/anvaya-wasi; intent, energy, and live service calls planned
App packagingSigned app/service/driver manifest with policy-narrowed capability grants🔄 Initial no-std manifest/signature/policy core in runtime/anvaya-package, bounded installer registry/archive bridge in runtime/anvaya-installer, and signed WASM package runner in runtime/anvaya-runner with narrow imported file, storage, DNS, TCP, WASI clock, stdio, guest-memory result-record, and Anvaya capability-extension proof calls; nucleus QEMU now consumes raw signed proof packages, runs all twelve catalog apps through the bounded runner, requires ANVAYA WASM APP SOURCE CATALOG OK, installs/runs bounded package records, dispatches installed apps as application processes from package launch grants, and asserts missing-grant denial cases; block-backed package storage, trust-root/key policy, broader guest WASI imports, service IPC, and production loader launch planned
SDK v1Developer SDK and documentation🔄 Initial RFC 0010 ABI crate exists; final WASM/app SDK planned
Example appsShell utilities as WASM🔄 Twelve tiny proof apps in examples/anvaya-wasm-apps now include imported file, storage, DNS, TCP, WASI clock, WASI fd_write, guest-memory result-record, and Anvaya capability-extension examples with no-std source recipes rebuilt byte-for-byte in tests and gated by ANVAYA WASM APP SOURCE CATALOG OK; they are exercised through the signed package runner, bounded nucleus QEMU storage/network service-core plus app launch/install/app-loader/denial proofs, and the scripts/demo-v0-3-apps.sh proof demo; external toolchain-built WASI utilities and production loader launch remain planned

🏁 Milestone: Anvaya 0.5 — "AI Agents Run Natively" — ✅ RELEASED (v0.5.0, 2026-07-13)

Status: Released. All four completion gates (A–D) are closed. See CHANGELOG.md, the v0.5.0 tag, and V0_5_GOAL.md for the detailed evidence map. The parallel 0.5.5 FML13V01 hardware preview remains physically open; 0.6 — "Constitution & Human Override" is released.

🏁 Interim Milestone: Anvaya 0.5.5 — "FML13V01 First Hardware Preview" — 🚧 ACTIVE

Status: v0.5.4 keeps FML13V01 at Buildable while adding a reproducible regular-file vendor-clone media safety pipeline and deterministic hardware-log verifier to the mutually exclusive profiles, strict OpenSBI/DTB validation, pinned fixtures, and U-Boot bundle. The current candidate adds strict boot/Image/firmware identity binding plus bounded UART, one SBI TIME interrupt, SBI SRST readiness, and the signed zero-grant hello-status path. Synthetic fixtures and a compiled path do not advance the support level. It is not First light until an acquired board supplies the runtime firmware/DTB, UART, timer/reset, signed-app, and continuous transcript evidence required by V0_5_5_GOAL.md. The physical test and release runbook is the only accepted path from Buildable to the v0.5.5 App demo release and goal closure.

🏁 Milestone: Anvaya 0.6 — "Constitution & Human Override" — ✅ RELEASED (v0.6.0, 2026-07-14)

Status: Released. Gate A adds the bounded three-tier rule engine and attested amendment/rollback path; Gate B adds the firmware escape core plus a real M-mode/PMP hostile-S-mode QEMU proof; Gate C binds structured rationales to the AEC effect boundary; Gate D adds audit format v3 and verifiable redaction. The M-mode result trusts firmware, PMP, and the emulated platform, and audit v3 is tamper-evident rather than hardware-sealed against complete deletion or rollback. See V0_6_GOAL.md for the exact evidence and claim boundaries. The next feature milestone is 0.7 — "Post-Quantum & Hardware-Anchored".

🏁 Milestone: Anvaya 0.4 — "Production Substrate" — ✅ RELEASED (v0.4.0, 2026-07-12)

Status: Released. All six completion gates (A–F) are closed. See CHANGELOG.md and the GitHub release. For the detailed gate and evidence map, see V0_4_GOAL.md. The successor milestone, 0.5 — "AI Agents Run Natively", is released as v0.5.0.

🏁 Milestone: Anvaya 0.3 — "Run WASM Applications" — ✅ RELEASED (v0.3.0, 2026-07-12)

Status: Released as the 0.3.0 developer preview. See CHANGELOG.md and the GitHub release.

For the detailed implementation gate and evidence map, see V0_3_GOAL.md. The next milestone is 0.4 — "Production Substrate".

Milestone Definition: Anvaya 0.3 is the first usable single-node developer-preview OS slice: the nucleus boots in QEMU, creates real isolated userspace processes through the RFC 0010 syscall boundary, runs an init/service manager, exposes capability-protected IPC, storage, and network services, and can install and execute signed WASM/WASI applications with explicit capabilities, documented SDK support, and repeatable QEMU evidence.

Success Criteria:

  • Filesystem service operational
  • Network stack functional (TCP/IP)
  • WASM runtime integrated
  • WASI + ANVAYA extensions working
  • Signed package/app manifest installed and launched with narrowed grants
  • SDK released with documentation
  • 10+ example applications
  • Developer getting-started guide

Demo: Boot ANVAYA, connect to network, download and run WASM application, access filesystem with capability protection.


2028: AI-Native Year

Theme: Make AI agents first-class citizens

Current spec status: RFC 0002 accepts the Agent Execution Context model for identity, goals, lifecycle, supervision, approval, quotas, audit, world-model boundaries, failure/cancellation, and the relationship to normal processes, tasks, capabilities, IPC, and RFC 0010 syscalls. The bounded Gate A–D service and runtime slices are evidence-backed in the released v0.5.0 tree, including the audited Broker→AEC creation bridge, side-effect-free world model, exact approval binding/effect boundary, and capability-bound A2A coordination. These remain bounded milestone cores rather than production daemons or UI.

Q1 2028 (Jan-Mar): Intelligence Broker v1

DeliverableDescriptionStatus
Model registryStore and version AI models✅ Bounded no-std core + tests + QEMU
Model loadingLoad models on-device✅ Exact content-bound capability grant + live dispatch
Inference APIRun inference with capability control✅ Model/tool grants + quota + audit + MCP tools/call
ONNX runtimeONNX model support⏳ Planned

Q2 2028 (Apr-Jun): Agent Execution Contexts

DeliverableDescriptionStatus
AEC implementationRuntime for accepted RFC 0002 identity, goals, lifecycle, capabilities, supervision, quotas, and audit✅ Bounded no-std core + tests + lower-process QEMU dispatch
World model sandboxIsolated reasoning space✅ Bounded side-effect-free world model + tests + QEMU
Approval workflowHuman/supervisor/constitutional exact-action approval✅ Expiry/substitution/capability/quota checks + QEMU
Audit loggingComplete bounded agent audit trail✅ Lifecycle, plan, denial, quota, action-start/result, reconciliation

Q3 2028 (Jul-Sep): Cognitive Sandboxing

DeliverableDescriptionStatus
Action approvalSeparate reasoning from execution✅ Exact approval binding + explicit executor boundary
Supervisor agentsAgent hierarchy✅ Rooted supervisor-agent approval form in bounded AEC core
Constitutional rulesAutomatic approval for safe actions✅ Three-tier engine with higher-tier bounds, attested amendment, review, and rollback released in 0.6
Interpretability APIExplain agent decisions✅ Capability-gated, rule/approval-bound rationale schema released in 0.6

Q4 2028 (Oct-Dec): Multi-Agent Coordination

DeliverableDescriptionStatus
Agent discoveryFind and connect to other agents✅ Capability-scoped Agent Cards
Coordination primitivesMessage passing between agents✅ SVID-attributed bounded messages + capability transfer
Task delegationAgents delegating to sub-agents✅ Capability/quota attenuation + bound receipts
Conflict resolutionHandle competing agent goals✅ Deterministic capability-scoped arbitration

🏁 Milestone: Anvaya 0.5 — "AI Agents Run Natively"

Target Date: December 31, 2028

Success Criteria:

  • Intelligence Broker operational (bounded Gate A service slice)
  • AECs implemented with full accepted RFC 0002 lifecycle (bounded Gate B runtime)
  • Cognitive sandboxing working (bounded Gate C core)
  • Approval workflows functional (bounded Gate C core)
  • Multi-agent coordination working (bounded Gate D core)
  • 5+ example AI agents (roadmap stretch item, not a V0_5_GOAL.md completion gate)
  • Agent development guide (roadmap stretch item, not a V0_5_GOAL.md completion gate)

Demo: Create an AI assistant agent that can read files, query the web, and take actions with user approval. Show audit trail of agent decisions.


2029: Distributed Year

Theme: Connect devices into a seamless mesh

Q1 2029 (Jan-Mar): Device Mesh Foundation

DeliverableDescriptionStatus
Device discoveryFind nearby ANVAYA devices⏳ Planned
Pairing protocolSecure device pairing⏳ Planned
Cross-device IPCMessage passing between devices⏳ Planned
Capability transferDelegate capabilities across devices⏳ Planned

Q2 2029 (Apr-Jun): Distributed Storage

DeliverableDescriptionStatus
Content syncSync content-addressed objects⏳ Planned
CRDT namespacesConflict-free namespace sync⏳ Planned
Selective syncSync policies (what/when/where)⏳ Planned
Offline supportWork offline, sync when connected⏳ Planned

Q3 2029 (Jul-Sep): Distributed Intelligence

DeliverableDescriptionStatus
Inference routingRoute inference to best device⏳ Planned
Model distributionSync models across devices⏳ Planned
Context sharingShare agent context across devices⏳ Planned
Edge/cloud fallbackUse edge or cloud when needed⏳ Planned

Q4 2029 (Oct-Dec): Interface Layer

DeliverableDescriptionStatus
Intent routerMulti-modal interaction⏳ Planned
CLI personalityComplete command-line interface⏳ Planned
Touch personalityTablet/phone UI⏳ Planned
Desktop compositorWindowed UI (Wayland-based)⏳ Planned
Voice interfaceSpeech input/output⏳ Planned

🏁 Milestone: Anvaya 0.8 — "Multi-Device Mesh"

Target Date: December 31, 2029

Success Criteria:

  • Device mesh operational
  • Capabilities delegate across devices
  • Storage syncs between devices
  • Inference routes intelligently
  • CLI interface complete
  • Touch interface functional
  • Desktop compositor working
  • Voice interface basic support

Demo: Start a task on a wearable, continue on phone, complete on desktop. AI agent seamlessly uses compute across all devices.


2030: Production Year

Theme: Harden, optimize, and ship

Q1 2030 (Jan-Mar): Security Hardening

DeliverableDescriptionStatus
Complete verificationFinish Nucleus formal proofs⏳ Planned
Security auditExternal security firm audit⏳ Planned
Penetration testingRed team assessment⏳ Planned
Vulnerability fixesAddress all findings⏳ Planned
Post-quantum cryptoFull PQC integration⏳ Planned

Q2 2030 (Apr-Jun): Performance Optimization

DeliverableDescriptionStatus
Fast-path extensionsNetwork, storage, tensor in-kernel⏳ Planned
BenchmarkingCompare to Linux, other OSes⏳ Planned
ProfilingIdentify and fix bottlenecks⏳ Planned
Memory optimizationReduce footprint⏳ Planned
Boot timeOptimize boot sequence⏳ Planned

Q3 2030 (Jul-Sep): Ecosystem

DeliverableDescriptionStatus
Package managerANVAYA package system⏳ Planned
Package repositoryHost packages⏳ Planned
Documentation siteComplete docs.anvaya.dev⏳ Planned
Example applicationsFull application suite⏳ Planned
Hardware partnershipsWork with RISC-V vendors⏳ Planned

Q4 2030 (Oct-Dec): Launch

DeliverableDescriptionStatus
Release candidateRC1, RC2, RC3 as needed⏳ Planned
Bug fixesAddress RC feedback⏳ Planned
Documentation polishFinal documentation review⏳ Planned
Launch preparationWebsite, marketing, announcement⏳ Planned
ANVAYA 1.0 RELEASEProduction release⏳ Planned

🏁 Milestone: Anvaya 1.0 — "Production Release"

Target Date: December 31, 2030

Reconciliation (2026-07-16): the compressed development effort reached a feature-complete, QEMU-proven 1.0.0 milestone far ahead of this five-year plan. That milestone delivered the software/verification criteria below under QEMU (formal verification, PQC demonstrated, emulated benchmarks, docs). The criteria that require physical hardware, an external audit, and an ecosystem — Linux-competitive perf on real silicon, an external security audit, hardware vendor support, multiple form factors, 100+ packages, and a 100+ contributor community — remain open and define this production-launch target. Checkboxes below reflect the production-launch bar, not the QEMU milestone. The two long-lead items among them — the physical board and the external audit — carry owning milestones and review dates in Long-lead external gates.

Success Criteria:

  • Nucleus formally verified (accepted invariants, bounded — QEMU/proof)
  • External third-party security audit passed (design-time negative tests done; external audit OPEN)
  • Post-quantum cryptography demonstrated across every trust surface (operational rekey not yet universal)
  • Performance competitive with Linux for target workloads (emulated benchmarks done; physical A/B OPEN)
  • 100+ packages available
  • Complete documentation
  • Hardware vendor support
  • Multiple device form factors supported
  • AI agents run reliably in production against accepted RFC 0002 semantics
  • Community of 100+ contributors

Demo: Full ANVAYA installation on RISC-V laptop, running AI assistants, connected to phone and wearable, with verifiable security guarantees.


Long-lead external gates

2026-10-01 acquisition review: the user confirms no physical FML13V01 board is available. The v1.8 candidate can be validated locally under QEMU. Physical boot remains a required v1.9 gate; acquisition status must be reviewed again at the v1.8 tag. This observation does not defer or remove v1.9 acceptance.

Added 2026-08-26. Two production-launch criteria cannot be closed by any amount of QEMU work, and both have lead times measured in months. They were being carried as undated "open items"; this section gives each one an owning milestone and a review date so neither is discovered late.

GateStatusOwning milestonePrerequisiteNext review
Physical board boot (DC-ROMA Mainboard I, FML13V01)Buildable, board not acquired1.9 — Scale extensions & HAL (the hardware on-ramp release)Board acquisition, plus untouched vendor media imaged under the read-only procedure in FML13V01_HARDWARE_READINESS.mdAt 1.8 tag
Physical board boot (SHAKTI C-class on Arty A7-100T)Buildable since 1.8.2; QEMU shakti_c lanes pass; loading kit prepared1.9 physical gateIIT Madras loads the kit with their existing JTAG route and returns full serial captures, per SHAKTI_HARDWARE_READINESS.mdWhen a capture arrives
External third-party security auditOPEN (design-time negative tests and tabletop done)Deferred past 1.9, deliberatelyPrivileged TCB at or near the ~15k manifesto target; RFC 0025 threat model accepted rather than draftAt 1.9 tag

Why the board is a 1.9 prerequisite, not a 1.7/1.8 one. Everything the board can prove — real timer topology, SBI reset, physical DMA isolation, boot media — sits behind the HAL and board-profile split that 1.9 is already scheduled to build (V1_1_GOAL.md). Acquiring hardware earlier would produce evidence the codebase has nowhere to put. Acquiring it later than 1.9 would leave the HAL unvalidated against real silicon, which is the one thing it exists to abstract. The acquisition itself must therefore start before 1.9 opens, which is why the review lands at the 1.8 tag.

Why the audit is deliberately deferred. The privileged TCB is 22,379 lines today against a ~15k target, and the M1 extraction march is still removing subsystems from it each release (storage left in 1.6; the network service leaves in 1.7). Commissioning an external audit against a core that is still shedding thousands of lines per release buys a report about code that will not exist. The audit is worth commissioning once the TCB is stable and the threat model (RFC 0025) is accepted rather than draft — expected after 1.9.

This is a deferral, not a dismissal. Neither gate may be quietly dropped, and neither may be claimed as met by an emulated substitute. Until both close, the 1.x line stays honestly labelled QEMU-proven and the manifesto's own "Production 1.0" bar (errata E2) remains 2030.


Post-1.0 Vision (2031+)

Anvaya 1.x Series

  • Hardware vendor partnerships and commercial adoption
  • Consumer device ports
  • Advanced AI features (model fine-tuning, agent learning)
  • Neural interface research

Anvaya 2.0 (Target: 2033)

  • AGI-ready safety features
  • Self-improving toolchain
  • Hardware secure enclaves
  • Formal verification of more components

Long-Term

  • Become the standard OS for AI systems
  • RISC-V default choice
  • Sustainable computing standard
  • Human-AI collaboration infrastructure

Resource Requirements

Team Growth Plan

YearCore TeamContributorsFocus Areas
2026510-20Kernel, infrastructure
20271030-50Services, runtime
20281550-100AI, agents
202920100-200Distributed, UI
203025200+Polish, ecosystem

Infrastructure Needs

YearComputeCI/CDHardware
2026Cloud devGitHub Actions5x dev boards
2027Build farmSelf-hosted20x boards
2028GPU clusterAdvanced testing50x boards
2029Edge nodesMulti-arch100x devices
2030Full infraProduction CIVendor hardware

Risk Assessment

Technical Risks

RiskLikelihoodImpactMitigation
RISC-V ecosystem immatureMediumHighSupport ARM fallback for development
Formal verification delaysHighMediumPrioritize critical paths, accept partial verification
Performance issuesMediumMediumEarly benchmarking, fast-path extensions
CHERI hardware unavailableMediumHighSoftware capability enforcement fallback

Project Risks

RiskLikelihoodImpactMitigation
Insufficient contributorsMediumHighActive community building, clear onboarding
Funding gapsMediumHighSeek grants, corporate sponsors
Competing projectsLowMediumDifferentiate on AI-native, sustainability
Scope creepHighMediumStrict milestone discipline, defer features

Success Metrics

Technical Metrics

Metric0.10.30.50.81.0
Lines of code (Nucleus)5K8K10K12K15K
Test coverage (Nucleus)70%80%85%90%95%
Verified lines01K3K6K10K
Supported RISC-V boards1351020

Community Metrics

Metric20262027202820292030
GitHub stars1K5K15K30K50K
Contributors2050100200500
Discord members1005002K5K10K
Packages1050150300500

How to Help

Now (2026)

  • Star the repo and spread the word
  • Review and comment on architecture
  • Contribute to Nucleus development
  • Write documentation
  • Test on RISC-V hardware

Soon (2027-2028)

  • Build system services
  • Develop applications
  • Improve developer experience
  • Create tutorials

Later (2029-2030)

  • Port to new hardware
  • Build commercial products
  • Contribute to ecosystem
  • Mentor new contributors

This roadmap is a living document. Updates are made quarterly based on progress and community feedback.